Week 4: Creating Charts Assignment
- Due No due date
- Points 30
This assignment is part of the module Week 4 - Spreadsheets: Formulas & Charts and hasn't been unlocked yet.
Completion Prerequisites
The following requirements need to be completed before this page will be unlocked:Rubric
Please include a title
Criteria | Ratings | Pts |
---|---|---|
Assignment 1: Worksheet created correctly
threshold:
pts
|
pts
--
|
|
Assignment 1: 3D pie chart created with correct layout
threshold:
pts
|
pts
--
|
|
Assignment 1: Chart on own sheet named Time Pie
threshold:
pts
|
pts
--
|
|
Assignment 1: Chart title added and text correct
threshold:
pts
|
pts
--
|
|
Assignment 2: Worksheet created correctly
threshold:
pts
|
pts
--
|
|
Assignment 2: Cluster column chart created with correct title
threshold:
pts
|
pts
--
|
|
Assignment 2: Chart on own sheet named Salaries
threshold:
pts
|
pts
--
|
|
Assignment 2: Vertical axis values formatted in currency style
threshold:
pts
|
pts
--
|
|
Assignment 3: Engineer added to worksheet
threshold:
pts
|
pts
--
|
|
Assignment 3: Chart data changed to include row 11
threshold:
pts
|
pts
--
|
|
Assignment 3: Chart type changed to clustered bar with green marble texture fill
threshold:
pts
|
pts
--
|
|
Assignment 3: Add text box with correct text
threshold:
pts
|
pts
--
|
|
Assignment 3: Change chart title text to green accent 6, darker 50%, Bold, 24 point
threshold:
pts
|
pts
--
|